What it is
Thermography reads the surface temperature of a module under load. A healthy module runs even across its cells; a cracked cell, a failed bypass diode, a bad solder joint, or a shaded or soiled substring shows up as a hot cell, a hot string, or a hot junction box. Done at module level, in the right irradiance window, with the camera at the right angle, that pattern tells you what failed and usually why.
We follow the practice in IEC TS 62446-3 (outdoor infrared thermography of PV modules and plants): minimum irradiance, stable conditions, emissivity and reflection control, viewing angle, and a defined classification of each anomaly. Every finding is tied to a module serial and a string position so it can be acted on.
When you need module-level, not aerial
Hail and storm claims
Microcracks don't show in a visual or a drone pass. A module-level IR survey after an event, compared against a baseline, is what the adjuster and the manufacturer can act on.
Installer-error warranty disputes
Hot junction boxes, connector heating, and string-level patterns separate a product defect from a workmanship problem. That distinction decides who pays.
Underperforming arrays
When production is off and the monitoring can't say why, a thermal survey localizes the problem to the string, the module, or the cell — before anyone starts pulling panels.
Pre-handover and warranty-expiry baselines
A documented thermal baseline at commissioning, and again before the workmanship warranty runs out, is cheap insurance against an argument later.
How a survey runs
- Scope call. Site, system size, module and inverter type, what triggered the request, and what documentation the claim needs.
- Conditions check. Surveys run only in the irradiance and wind window the standard calls for. If the day won't produce a defensible image, we reschedule rather than deliver a weak one.
- Module-level capture. Every module imaged at the correct angle and distance, with the array under load. Visual photos alongside each thermal frame.
- Electrical confirmation where it matters. String IV / Voc / Isc and insulation-resistance checks on suspect strings, so a thermal anomaly is backed by a measurement.
- Report. Anomaly map by string and module serial, classification per IEC TS 62446-3, likely cause, and a recommended action for each item. Delivered in a format the manufacturer, insurer, or O&M provider can use directly.
Commissioning & QA support
The same discipline applied before energization. We support EPCs and project teams that need commissioning capacity on commercial rooftops and ground mounts — from a superintendent who has commissioned the plants, not just inspected them.
Insulation resistance (Megger)
IR testing on DC strings and feeders, documented per string with pass/fail against the project spec.
String verification
Polarity, Voc, Isc, and string-to-combiner mapping confirmed against the drawings before the inverter sees it.
AC / DC routing and grounding
Conduit routing, conductor sizing, terminations, torque, and the grounding and bonding path checked and recorded.
Documentation
Commissioning checklists, test records, and closeout photos assembled as the work happens — not reconstructed afterward.
Recent work: 4 MW superintended in 2026 — Westminster (1 MW) and Abingdon (1.6 MW) built start to finish and commissioned; Salisbury (1.4 MW) in progress.
Questions we get
- Can't a drone do this faster?
- For a first pass on a large plant, yes — and we offer that under drone services. But aerial IR can't resolve cell-level patterns, can't control the viewing angle per module, and isn't accepted on its own for most microcrack causation claims. Use aerial to find where to look; use module-level to prove what you found.
- What do I get at the end?
- A written report with the anomaly map, thermal and visual images per finding, module serials and string positions, the classification, and the recommended action. Raw image files on request.
- Do you fix what you find?
- We can — module swaps, connector and junction box repairs, and panel removal and reinstall are in-house. We also hand findings to your existing O&M provider if you prefer.
- Credentials?
- Surveys are performed to IEC TS 62446-3 practice by the founder — 14 years in solar, 4 MW superintended in 2026.